Installation of approximately 26,165 feet of two-inch Cable-In-Conduit, utilizing Horizontal Directional Drilling (HDD) technology of four NSTAR service territories located in Cape Cod, MA. Work included all required fiberglass, and/or concrete pull boxes, single-phase switching stations, grounding, bond frames, temporary and permanent restoration. The project was performed at four locations in Cape Cod, Massachusetts in the NSTAR service territory.
Brian Kalwicz
Project Manager
Jeff Mador
Project Manager
Tom Bonnett
Foreman