This multi-million dollar project called for the repaving of sixteen miles of the Northern State Parkway, stretching from Route 110 to Happauge. We approached this project with value engineering in mind, utilizing two RoadTec 900x on the 25-feet wide roadway, which enabled us to mill both lanes simultaneously. We also utilized Michigan wedge pavement joints to eliminate the need to back up and square up the new paving each night, increasing our productivity, resulting in an expedited project schedule and a reduction in project cost.