Inspection of Astoria Generating Company’s 138kV High Pressure Fluid Filled (HPFF) feeders 23161 and 23162, and manholes 70830 and 70832. These cables connect the Narrows Generating Facility to Con Edison’s Greenwood substation. The work included photos of the pipes within the manholes, depth gauge of areas on the pipes, and removing loose coating for hidden damage evaluation.

Project Completed: 22 days