FEMA Long Island Electric Distribution Storm Hardening

FEMA Long Island Electric Distribution Storm Hardening

PSEG Long Island

This $100+ million three-year reliability and resiliency project will further strengthen the electric grid across Long Island and in the Rockaways. In response to Hurricane Sandy, LIPA and National Grid (the previous service provider to LIPA) acquired funds from FEMA under the FEMA 406 Mitigation program to implement a Hazard Mitigation Program to the LIPA transmission and distribution system. The primary focus of the Program is to harden Long Island’s Transmission and Distribution system by upgrading approximately 450 miles of mainline distribution lines. This is an effort to resist future storm damage and gain a 20% reduction in the number of customers impacted by service interruptions when storm damage occurs.

Project Details

Rockaway Boardwalk Reconstruction

Rockaway Boardwalk Reconstruction

Rockaway, New York

In overcoming the devastation of Hurricane Sandy, Grace Industries was assigned the task of restoring the Rockaways. Grace Industries, to date, has been awarded 19 contracts at the Rockaway Boardwalk project spread out over five phases. The project site spans 4.7 miles and comprises of the beaches, boardwalks, and adjacent DPR property lines. Our expertise is required in repairing the damage the storm has left behind and establishing new protective measures. This includes more durable structures and dunes capable of withstanding the strong forces of incoming storms to prevent excessive damage from future natural disasters.

Project Details

Long Beach Boardwalk Reconstruction

Long Beach Boardwalk Reconstruction

City of Long Beach

The scope of this $44 million project called for the reconstruction of the iconic Long Beach Boardwalk. The 2.2 mile long boardwalk was destroyed by Superstorm Sandy. This 200-day fast tracked project is on time and on budget.

Project Details

City of Long Beach Comfort Stations

City of Long Beach Comfort Stations

City of Long Beach, NY

Grace Industries performed the construction of five elevated Comfort Stations along the Long Beach Boardwalk to replace bathrooms which were heavily damaged during Superstorm Sandy. The work included construction of pile supported, cast-in-place concrete foundations. The bathroom structures were prefabricated concrete units assembled using a crane at each location.

Project Details

NCDPW Bay Park Sewage Treatment Plant Perimeter Flood Protection Berm & Wall

NCDPW Bay Park Sewage Treatment Plant Perimeter Flood Protection Berm & Wall

NCDPW

Grace Industries was tasked with constructing a 6,700 linear foot flood wall around the Bay Park Sewage Treatment Plant in East Rockaway, New York to protect against storms like Superstorm Sandy. The wall consists of a subterranean slurry wall extending 25 feet below sea level, as well as a combination of concrete walls and earthen levee berms that reach 17 feet above sea level.

Project Details